Our client required a large pallet racking installation in 5 large chambers of ambient, chilled and frozen storage.
The pallets are loaded and unloaded at speed in this fast moving consumer environment using articulated forklift trucks. The heavy duty system is over 9000mm high and due the volume of traffic all the necessary safety features have been included such as floor mounted frame protectors and end of rack barriers.
The total pallet count on site is 5480 No pallets stored across all 5 chambers.